HomeQuality

What we check before dispatch.

We agree the design basis, material system and inspection requirements before fabrication.

01 Inspection record

Inspection points

  • Process inputs and duty review
  • Material identification and traceability
  • Dimensional and visual checks
  • Nozzle and accessory verification
  • Agreed leak or hydro testing
  • Dispatch documentation
Technician checking the finish of a green FRP vessel before completionQA / 01
Workshop fit-up and finish checkFRP vessel

02 Design basis

Criteria agreed for each project.

We review chemistry, concentration, temperature, density, pressure or vacuum, loading and installation conditions before detailing the equipment.

We confirm the applicable project specifications, standards, inspection level and acceptance requirements during enquiry review.

Enquiry desk

What are you working on?

Share your process requirements or part drawing with our team in Sarigam.

Start an enquiry